Facility

State-of-the-art hangar with two docks.
In the hangar with 6,000 square meters two aircraft can be overhauled simultaneously and two additional can undergo a lighter check. In both docks aircraft can be painted on the spot without being pulled into a special painting hangar, saving time and money. A state-of-the-art ventilation system avoids paint being splashed on surrounding workshops. Also it keeps dangerous gases from being emitted into the atmosphere. Numerous workshops, for example for non destructive testing, are located on the company premises with 2,783 square meters.